ETHANOL PLANT EXPANSION
Industry:
Chemical
Location:
Alberta
Services Provided:
3D Scanning, Drafting, Fabrication, Construction
pROJECT sUMMARY
The project involved expansion of a complex brownfield site in a congested plant, and required installation of (8) pieces of major equipment including a 90ft tower, cooler, and boiler.
To accommodate the tight timeframe our fabrication facility operated a day and night shift to accommodate the tight schedule required for the client. Field crews were mobilized with a tool crib to complete the installation.
The project was successful and completed on schedule.

project highlights
- Carbon Steel: 2,500 FDI
- Stainless Steel: 3,500 FDI
- Structural Steel: 25,000 KG