587.325.9996

orange-squares

ETHANOL PLANT EXPANSION

The project site was a brownfield complex in a congested plant, and required installation of (8) pieces of major equipment including a 90ft tower, cooler, and boiler.

To accommodate the tight timeframe our fabrication facility operated continuously on a 24 hour schedule to complete manufacturing. Our computer science team also developed a contactless sign in system for Covid-19 that was implemented internally and adopted externally by the client.


Location:
Central Alberta

Role: Mechanical General Contractor

Let's Work Together