23-063 – CYCLONE PACKAGE ADDITION
Leveraging the 3D scanning data, our team
then expertly designed the engineering plan for the addition of the cyclone package and the replacement of the recirculation pump along with its associated piping.
23-058 – FLARE FUEL GAS LINE REPLACEMENT
This project involved the replacement of corroded flare
lines at a SAGD facility near Cold Lake, Alberta. Sections
of the line were located within the radius of a flare zone which posed significant risk to personnel. To mitigate the risk, the lines, structural steel, and tie-points were scanned with LIDAR and 100% pre-fabricated at our facility in Grande Prairie.
22-295 – TANK FARM EXPANSION & HMI PROCESSING CENTER RELOCATION
This project involved conducting detailed 3D scanning and modeling of an oil depot located within a hydroelectric facility in Varennes, Quebec.
23-325 – OTSG + HRSG PIGGING SPOOLS UPGRADE
ONSITE3D was engaged to design and fabricate more efficient pigging spools for their OTSGs and HRSGs at the client’s SAGD facility.