587.325.9996

23-063 – CYCLONE PACKAGE ADDITION

Leveraging the 3D scanning data, our team
then expertly designed the engineering plan for the addition of the cyclone package and the replacement of the recirculation pump along with its associated piping.

23-254 HORSE & LELAND PLANT DEBOTTLENECK​

This integration aimed to de-bottleneck the Horse plant by
utilizing the mothballed refrigeration skid, inlet separation,
and flare systems of the LSP. Two options were evaluated:
continuing as two separate plants or fully integrating the
Leland Plant into the Horse Plant.