587.325.9996

23-192 – REFINERY CWP VERIFICATION

The project, a comprehensive 3D Scan & Survey, was a large-scale endeavor that spanned 30 days and encompassed multiple plants. Our team successfully verified over 250 Issued for Construction (IFC) drawings for dimensional accuracy and constructability, ensuring that the construction work packages (CWPs) aligned perfectly with the onsite conditions and specifications.