23-254 HORSE & LELAND PLANT DEBOTTLENECK
This integration aimed to de-bottleneck the Horse plant by
utilizing the mothballed refrigeration skid, inlet separation,
and flare systems of the LSP. Two options were evaluated:
continuing as two separate plants or fully integrating the
Leland Plant into the Horse Plant.
23-192 – REFINERY CWP VERIFICATION
The project, a comprehensive 3D Scan & Survey, was a large-scale endeavor that spanned 30 days and encompassed multiple plants. Our team successfully verified over 250 Issued for Construction (IFC) drawings for dimensional accuracy and constructability, ensuring that the construction work packages (CWPs) aligned perfectly with the onsite conditions and specifications.
23-210 – OIL SANDS TURNAROUND – TAIL GAS
ONSITE3D delivered comprehensive mechanical support for
a significant oil sands operation in Northern Alberta, playing a
key role in completing vital mechanical tasks during the site’s
turnaround.