20-373 – ETHANOL PLANT EXPANSION
To accommodate the tight timeframe our fabrication facility operated a day and night shift to accommodate the tight schedule required for the client. Field crews were mobilized with a tool crib to complete the installation.
22-404 – INSTRUMENT AIR SYSTEM UPGRADE
ONSITE3D was engaged to provide 3D scanning, drafting and fabrication services for the Instrument Air Upgrade at a polyethelene plant in Central Alberta.
23-192 – REFINERY CWP VERIFICATION
The project, a comprehensive 3D Scan & Survey, was a large-scale endeavor that spanned 30 days and encompassed multiple plants. Our team successfully verified over 250 Issued for Construction (IFC) drawings for dimensional accuracy and constructability, ensuring that the construction work packages (CWPs) aligned perfectly with the onsite conditions and specifications.
23-210 – OIL SANDS TURNAROUND – TAIL GAS
ONSITE3D delivered comprehensive mechanical support for
a significant oil sands operation in Northern Alberta, playing a
key role in completing vital mechanical tasks during the site’s
turnaround.